Rafamet S.A.

Building area: 3 715 m2

Yet another investment carried out under the „design and build” system. Our offer was selected in a tender process for its lowest cost. The heavy industry, highly complex and requiring an appropriate infrastructure, raised the bar several notches. We had to build a facility which was extremely technologically advanced. And we succeeded! We assisted the Investor in the process of preparing the decisive assumptions by suggesting appropriate technical solutions. We took on the challenge of installing incredibly complex cooling and heating systems, as well as complicated structure and overhead cranes with a lifting capacity of 125 metric tons suspended at a height of approx. 20 m. We also utilized heavy floors with a load of 60 t/m2 in the building.